Requirements
The following requirements must be fulfilled for operating the positioning unit for Sensor 3 with the ekr 500 digital Unit Touch controller:
- A positioning unit with a BST CLS Pro 600 line and contrast sensor is connected to the socket X101 (Sensor 3) of the controller.
